Pipeline Safety: Timeframe to Make Rupture-Mitigation Valves Operational
Details
The document's own metadata, straight from the source system.
- Title
- Pipeline Safety: Timeframe to Make Rupture-Mitigation Valves Operational
- Posted
- Apr 24, 2026
- Comment period
- Apr 24, 2026 – Sep 4, 2026
- FR Doc
- 2026-08076
- CFR
- 49 CFR Parts 192 and 195
- Topics
Overview
What the public is saying — stance, who's commenting, and the issues they raise.
Stance breakdown
Who commented
Breakdown by commenter type.
Comments over time
Weekly arrivals, stacked by stance.
Support × commenter type
How each type splits across stance.
Issues raised
The docket's canonical issues. Select one to browse its comments.
Position map
Who stands where on each issue?
Every non-silent position is backed by an excerpt from the comment.
Issues shown
Choose up to five.
| Organization | 14-day operational timeframe |
|---|---|
National Propane Gas Association Trade associationSupport The National Propane Gas Association (NPGA), representing approximately 2,400 companies in the propane industry, support |
Explorer
Every mirrored comment — filter by stance, campaign, or issue.
- Jun 23, 2026National Association of Pipeline Safety Representatives (NAPSR)SupportTrade association📎 Attachment
The National Association of Pipeline Safety Representatives (NAPSR), an organization of state agency pipeline safety managers, supports the proposed rule to extend the timeframe for making rupture-mitigation valves operational from 14 to 90 days. They argue that the current 14-day window is too narrow for proper installation and testing, and that a 90-day period allows for necessary logistical steps without compromising safety.
Read comment → - Jun 23, 2026Southwest Gas CorporationSupportBusiness📎 Attachment
Southwest Gas Corporation, a natural gas local distribution company, supports the proposed rule to extend the timeframe for making rupture mitigation valves (RMVs) operational from 14 days to 90 days. They also endorse the comments submitted by the American Gas Association regarding the revision of these requirements.
Read comment → - Jun 23, 2026Interstate Natural Gas Association of AmericaSupportTrade association📎 Attachment
The Interstate Natural Gas Association of America (INGAA) supports the proposal to extend the timeframe for making rupture-mitigation valves (RMVs) operational from 14 to 90 days. They argue that the current timeframe is difficult for operators to meet due to construction and technical complexities, and that the extension reduces regulatory burden without compromising safety.
Read comment → - Jun 23, 2026American Petroleum Institute and Liquid Energy Pipeline AssociationSupportTrade association📎 Attachment
The American Petroleum Institute (API) and the Liquid Energy Pipeline Association (LEPA) support the proposed rule to extend the timeframe for making rupture-mitigation valves (RMVs) operational from 14 days to 90 days. They argue that the current 14-day requirement is disproportionately burdensome and that a 90-day window provides necessary flexibility for operators to address operational and weather-related challenges without compromising safety.
Read comment → - Jun 23, 2026American Gas Association (AGA) and American Public Gas Association (APGA)SupportTrade association📎 Attachment
The American Gas Association and the American Public Gas Association support the proposal to extend the timeframe for making rupture mitigation valves (RMVs) operational from 14 to 90 days. They argue that the current 14-day requirement is often impractical due to construction delays, power supply issues, and safety hazards, and that the extension will allow for safer, more thorough commissioning.
Read comment → - Jun 23, 2026Pipeline Safety TrustOpposeAdvocacy📎 Attachment
The Pipeline Safety Trust, a nonprofit watchdog organization, opposes the proposed extension of the rupture-mitigation valve (RMV) operability deadline from 14 to 90 days. They argue that the proposal is based on unsubstantiated industry claims, lacks sufficient data analysis, and poses a significant risk to public safety by delaying the activation of critical safety mechanisms during the high-risk initial period of pipeline operation.
Read comment → - Jun 23, 2026Environmental Defense FundOpposeAdvocacy📎 Attachment
The Environmental Defense Fund (EDF) opposes the proposed rule to extend the timeframe for making rupture-mitigation valves (RMVs) operational from 14 to 90 days. They argue that the rule weakens critical safety standards established after the San Bruno disaster and that the Preliminary Regulatory Impact Analysis fails to account for the significant safety risks and potential for catastrophic events.
Read comment → - Jun 15, 2026National Propane Gas AssociationSupportTrade association📎 Attachment
The National Propane Gas Association (NPGA), representing approximately 2,400 companies in the propane industry, supports the proposed rule regarding the timeframe to make rupture-mitigation valves operational. While they note that the 14-day period is burdensome for their members, they ultimately express support for the rule and commend PHMSA for including hazardous liquids pipelines.
Read comment →